| Press | Profiles | Contacts | How to Find Us |


Recent Case Studies

News Archive

 

Kenda supplies metering equipment for Immingham CHP plant

The tariff metering system for the new PowerGen CHP plant at Conoco's Immingham refinery was designed, manufactured and commissioned by Southampton-based Kenda Electronic Systems Ltd.

The company supplied all the metering and data-collection panels, an ancillary panel housing flow computer and gas chromatograph controller equipment and a PC-based local collector station with proprietary Kenda software.

Based on Kenda's successful Meteor range of equipment, the data collectors calculate and store scaled values for each input integrated over the specified demand period (normally 30 minutes). The system's software then performs calculations on the collected metering data to provide total values and costs for billing purposes.

All design, manufacturing and testing of the tariff metering system was carried out under Kenda's rigorous BS EN ISO 9001 quality system.

This latest installation follows the successful implementation of Kenda metering data-collection systems at the Kemsley Mill and Iggesund CHP plants.

Kenda systems are also in use at hundreds of other sites throughout the UK electricity supply industry, with equipment having been supplied to all of the major power companies and to the National Grid Company as part of the Final Metering Scheme.

20th June 1997 Ref. KE115/2


 

Kenda Electronic Systems Ltd., Kendata Peripherals Ltd., Kendata Print Services and Earth Data Ltd. are all members of the Kenda Group. Kenda Group Headquarters: Nutsey Lane, Totton, Southampton, SO40 3NB, England.
Tel: +44 23 8086 9922 Fax: +44 23 8086 0800 Email: sales@kenda.co.uk